Dominar Engineers

Fire-Fighting Pump Installation at Pepsi‑Cola International

Fire-Fighting Pump Installation at Pepsi‑Cola International Pepsi‑Cola International in Lahore engaged Dominar Engineers to install a comprehensive fire‑fighting pump system, integrating electric-driven and diesel-driven main pumps along with a dedicated pressure‑maintenance (jockey) pump and centralized control system. This setup ensures steady and powerful water delivery when needed for emergency response.

Read More

Non‑Clogging Wastewater Pump Setup for Ombre Holding Pvt. Ltd.

Non‑Clogging Wastewater Pump Setup for Ombre Holding Pvt. Ltd. Ombre Holding engaged Dominar Engineers to design and install a robust wastewater handling solution featuring a horizontal non-clogging centrifugal pump driven by an electric motor, complete with a motor control unit. This system is engineered to reliably transport pre-treated wastewater and

Read More
  • 1
  • 2