Al Ghurair Giga Pakistan engaged Dominar Engineers to deliver a resilient fire-fighting pump setup featuring both electric and diesel-driven main units, a dedicated pressure-maintenance unit (jockey pump), and centralized control. This system provides up to 1,250 GPM at 15 bar designed for high-reliability fire suppression and emergency readiness.
The combination of electric and diesel pumps offers redundancy and ensures dependable operation, while the jockey pump preserves system pressure during standby periods. It automatically compensates for minor drops due to temperature shifts or minor leaks, helping avoid unnecessary main pump activation and reducing wear and energy use all managed via a smart control panel.
All key accessories pressure valves, check valves, and backup power are integrated into a single control scheme, ensuring automatic and compliant response when required. This installation reflects Dominar Engineers’ expertise in delivering safety-critical infrastructure with performance, reliability, and ease of maintenance.