Dominar Engineers

Fire-Fighting Pump Installation at Pepsi‑Cola International

Pepsi‑Cola International in Lahore engaged Dominar Engineers to install a comprehensive fire‑fighting pump system, integrating electric-driven and diesel-driven main pumps along with a dedicated pressure‑maintenance (jockey) pump and centralized control system. This setup ensures steady and powerful water delivery when needed for emergency response.

The system includes dual main pumps to guarantee redundancy, supplemented by a jockey pump that maintains system pressure during standby conditions. By automatically compensating for minor pressure drops, the jockey pump prevents unnecessary cycling of the main pumps helping conserve energy and reduce wear. A unified control panel manages seamless operation of all components, coordinating activation and standby modes to remain compliant and ready at all times.

Accessories such as pressure-regulating valves, non-return valves, flow meters, and backup storage tanks are also included in the solution. Together, these elements form a fully integrated, code-compliant fire‑fighting infrastructure designed for reliability, maintainability, and robust emergency performance.

Client

PEPSI-COLA INTERNATIONAL (PVT) LTD

Location

Lahore, Pakistan

Category

Construction & Engineering

Year Completed

2025